A reclaimed water line at Dakota and Colorado decided to develop a leak late at night on May 18th, 2021. IRWD was called and showed up within the hour to shut the valve off. The next morning, IRWD returned to open the valve and check the location of the leak. The source of the leak was detected, the line was repaired and the asphalt roadway was temporarily patched. About 4 weeks later, the roadway was repaired and restriped at no cost to the association. Before and after pictures located below.











